Aerial Intelligence

Mission Report

Engineering documentation and aerial data acquisition performed as part of the Atizapán–Atlacomulco Highway monitoring program.

Project
AT-AT Highway
Mission ID
260701-KM27-100-LOS-GALLOS
Mission Date
1 July 2026
Location
KM 27+100 · Los Gallos
Mission Overview

Executive Summary

33Visual conducted aerial data acquisition activities at the Los Gallos front, located near KM 27+100 of the Atizapán–Atlacomulco Highway project.

Field verification was completed before launch, including operating conditions, GNSS availability, the reference system, control-point visibility and the planned flight parameters.

During pre-flight review, the Above Sea Level altitude reference was corrected. The revised mission settings were verified before data acquisition began at 09:51.

Survey Coverage

Area Covered

The mission documented the following project front during the reporting period.

Survey Front 01
KM 27+100 · Los Gallos

Linear-route aerial acquisition performed to document current project conditions and support engineering review.

Field Operations

Operations Narrative

Before commencement of the mission, the crew confirmed the assigned project front, operating schedule, flight height, equipment condition and access requirements. Weather, operational restrictions and the available RTK/PPK source were reviewed.

The coordinate reference system and height type were verified, and the visibility of available ground-control points and checkpoints was confirmed. During this review, the mission's Above Sea Level reference was corrected before launch.

The linear-route mission began at 09:51. Visual line of sight and a secure operating perimeter were maintained while RTK/GNSS status was monitored. Mission information and field observations were recorded as part of the contemporaneous field checklist.

Chronology

Mission Log

Key field activities documented during the mission.

  1. Pre-flight

    Field and equipment verification

    Access, weather, flight equipment, GNSS conditions, control points and mission parameters were reviewed.

  2. Pre-flight

    Altitude reference corrected

    The ASL value was corrected and the updated mission settings were verified before launch.

  3. 09:51

    Data acquisition commenced

    Linear-route acquisition began at the KM 27+100 Los Gallos project front.

Field Record

Operational Observations

Altitude reference

The Above Sea Level value was corrected before the mission was launched.

Reference system

The recorded coordinate reference system and height type were verified rather than assumed from file or system labels.

Quality Assurance

QA/QC Summary

Summary metrics should be populated from the corresponding MissionQC report after processing.

—
GNSS Health
—
RTK Fixed
—
Images Acquired
—
Horizontal Precision
—
Vertical Precision
—
Flight Duration

Technical interpretation

Insert the mission-specific QA interpretation here. Note any spacing, GNSS, RTK, shutter, exposure or height-profile observations and explain whether they affected the completeness or usability of the acquired data.

Mission Outputs

Deliverables

Final outputs associated with this mission should be listed only after production and quality review have been completed.

✓
Orthomosaic
✓
Digital Elevation Model
✓
Point Cloud
✓
Perspective Imagery
✓
MissionQC Report
✓
Field Checklist
Supporting Documentation

Technical Appendix

The following supporting files provide the technical record behind this mission summary.