☰
33Visual · Aerial Intelligence

KM 33+000 – 35+000

Mission 260812 corridor reference organized around the AT-AT alignment, terrain context and field navigation.

August 12, 2026
KM 33+000 – 35+000
Interactive corridor reference with satellite and terrain views, alignment elevations and device location.
Corridor references
KM 33+000–35+000 corridor.
Start: KM 33+000.
End: KM 35+000.
KM 33+760 · PIV.
Select the route or reference points · Location requires browser permission

Corridor reference

This page presents the mission limits as a field and documentation reference. Route interpretation remains subject to current access, visibility, weather and obstacle conditions.

KM 33+000–35+000

2.0 km continuous AT-AT alignment segment. The corridor includes the PIV reference at KM 33+760 and follows the rising alignment toward KM 35+000.

Alignment basis: route geometry and elevations are derived from the current AT-AT project alignment supplied by the client.

Field use

Use the map to compare the corridor with surrounding terrain and the device position. The endpoint markers provide quick access to external navigation.

Start and end references

KM 33+000: 2624.81 m alignment elevation.
KM 35+000: 2735.96 m alignment elevation.

KM 33+760 · PIV

Project structure reference shown on the interactive map.

Operational note: validate access, takeoff, ascent, transfer, return-to-home and emergency routes independently against terrain, vegetation, structures and active works.