33Visual · Aerial Intelligence

KM 44+000 – 45+200

Mission 260813 corridor reference organized around the designated takeoff point, primary documentation limits and a conservative coverage extension.

August 13, 2026
KM 44+000 – 45+200
Primary corridor through KM 45+100, with protective coverage continuing to KM 45+200.
Mission references
KM 44+000–45+100 primary corridor.
KM 45+100–45+200 protective extension.
TOP KM 45+095.
Select the route or TOP · Location requires browser permission

Mission structure

The corridor is presented as an operational reference. Final execution remains subject to field access, visibility, weather, connectivity and obstacle verification.

KM 44+000–45+200Primary + protective extension

Primary terrain-following documentation corridor from KM 44+000 to KM 45+100, referenced to TOP KM 45+095. Coverage continues conservatively to KM 45+200 to account for the discrepancy observed in the physical KM marker.

Protective coverage: KM 45+100–45+200 is intentionally included as a conservative extension. It does not redefine the primary KM 44+000–45+100 mission segment.

Takeoff reference

TOP locations are planning references derived from the AT-AT alignment and should be positioned on the safest accessible nearby ground.

TOP KM 45+095

Reference for the full corridor, positioned immediately before the primary limit and protective extension. Confirm access, open-sky visibility and the transfer path before launch.

Operational note: terrain following applies to programmed capture lines. Validate ascent, transfer, return-to-home and emergency routes independently against terrain, trees, structures and active works.