
Mission 260813 corridor reference organized around the designated takeoff point, primary documentation limits and a conservative coverage extension.
The corridor is presented as an operational reference. Final execution remains subject to field access, visibility, weather, connectivity and obstacle verification.
Primary terrain-following documentation corridor from KM 44+000 to KM 45+100, referenced to TOP KM 45+095. Coverage continues conservatively to KM 45+200 to account for the discrepancy observed in the physical KM marker.
TOP locations are planning references derived from the AT-AT alignment and should be positioned on the safest accessible nearby ground.
Reference for the full corridor, positioned immediately before the primary limit and protective extension. Confirm access, open-sky visibility and the transfer path before launch.