
Mission 260813 corridor reference organized around the designated takeoff point, terrain conditions and connectivity requirements.
The corridor is presented as an operational reference. Final execution remains subject to field access, visibility, weather, connectivity and obstacle verification.
Continuous 1.5 km terrain-following documentation corridor referenced to TOP KM 37+000. The route transitions through curved and vegetated terrain; visual continuity and safe transfer/RTH clearance require field confirmation.
TOP locations are planning references derived from the AT-AT alignment and should be positioned on the safest accessible nearby ground.
Reference for the full corridor. Confirm open-sky visibility, connectivity, the ascent profile and the transfer path before launch.