☰
33Visual · Aerial Intelligence

AT-AT · KM 51+400 to KM 54+300

Two coordinated mapping missions covering six infrastructure elements, with priority structures identified for field execution.

Mission date · July 29, 2026
Mission coverage, KML alignments and structure priorities
Mission 1 covers KM 51+400–52+700. Mission 2 continues from KM 52+700–54+300. Select a mission or marker to review its field reference.
Select a route or structure for details · Ctrl / Command + scroll to zoom Tap a route or marker · Use two fingers to move or zoom
Map legend Map layers
Blue: Mission 1 KML alignment · KM 51+400–52+700.
Cyan: Mission 2 KML alignment · KM 52+700–54+300.
Red: priority structure requiring focused field attention.
Amber: scheduled structure without a RED priority flag.
White: current device location when permission is enabled.

Flight plan

The two uploaded DJI mapping-strip KMLs share a common handoff at KM 52+700, creating continuous coverage across the full work area.

Mission 1KM 51+400–52+700

10.0 m/s auto-flight speed · 74.5 m shoot height · 80% forward / 80% side overlap · 50 m safe takeoff height · RTH on completion.

Mission 2KM 52+700–54+300

10.5 m/s auto-flight speed · 74.5 m shoot height · 80% forward / 70% side overlap · 60 m safe takeoff height · RTH on completion.

Field priority: PSV 43, PIV 44, PSV 45 and PIV 46 are marked RED. Confirm takeoff position, VLOS, GNSS, highway exposure, emergency landing options and active construction activity before flight.
2Missions
2.9 kmCoverage
6Elements
4Red Priority
MissionCoverageKMElementPriority
Mission 151+400–52+70052+510ODTSTANDARD
Mission 151+400–52+70052+610PSV 43RED
Mission 252+700–54+30053+138PIV 44RED
Mission 252+700–54+30053+680ODTSTANDARD
Mission 252+700–54+30053+708PSV 45RED
Mission 252+700–54+30054+200PIV 46RED
Structure pins are projected by chainage along the uploaded KML centerlines for mission-planning reference. Confirm each position against current engineering controls before deployment.