Los Chaparrales
KM73+000–KM74+000 · Fixed ASLConstant capture plane across the future deck, approaches, existing terrain and vegetation.
- Route altitude: 2679.5 m ASL
- Terrain surface: 2605 m ASL
- 70 m left / 70 m right
- 2.0 cm GSD · 80% / 80% overlap

Programmed capture across Los Chaparrales, the intermediate corridor and El Pescado, with fixed-altitude viaduct coverage and a preplanned terrain-follow transition.
Constant capture plane across the future deck, approaches, existing terrain and vegetation.
The route follows existing terrain and ends before the El Pescado ravine. Its endpoint is fixed in the programmed mission.
The wider lateral strip captures the expanded highway footprint, ravine, vegetation and contextual terrain around the future structure.
The reference pin has been supplied for the August 13 program. The exact extraction, processing or stockpile surface to be mapped must still be confirmed before a mission boundary and production estimate are finalized.