261021 · Weekly Flight Plan
Weekly flight plan for the week of October 21, 2026.

Week of October 21
This week’s flight plan, required field checklist, and field safety guidance.
Project-wide references
Project maps, asset registers, survey control and volumetric references used throughout the AT-AT program.
Loading preview…
Loading preview…
Rain reference for the AT-AT project.
Proposed reference stations, corridor maps and a proof of concept for consistent positioning across AT-AT.
Survey control point references for the AT-AT project.
Survey calibration references for the AT-AT project.
Project volumetric measurements and reports.
Completed field records
Mission reports grouped by month, newest first.

September 23–25: photogrammetry mission execution, viaduct documentation, mapped column photographs and survey references.

September 17–18 mission execution report.

September 10–11: three photogrammetry missions, eleven structures and uploaded-file records.

Acquisitions from 2–4 September 2026: six photogrammetry missions, fifteen structures, interactive maps and uploaded-file records.
Flown & planned missions
Weekly mission plans grouped by month, newest first.
Weekly flight plan for the week of October 21, 2026.
October 14–16: corridor missions from KM36+300 to KM48+500, with reviewed TOP options and field capture notes.
October 7–9: terrain-following corridor missions, reviewed TOP alternatives and field checks.

September 30–October 2: KM20 Viaducto S/N, the connecting corridor and La Estadía, with two GNSS base occupations and column documentation.

September 23–25: viaduct photogrammetry at fixed ASL, column documentation and interactive mission maps.

September 17–18: photogrammetry at KM39+500–41+600 and KM46+500–49+000, structure documentation and TOP references.
KM33–KM45 corridor mapping and structure documentation scheduled for September 10–11.
KM20–KM42 viaduct and structure missions scheduled for September 2–4.
Mapping plan for Banco Santo Domingo at KM99+160, covering equipment, extraction areas and stockpiles within the ATAT perimeter.
Terrain-following corridor mapping with eighteen ODT, PIV and PSV structure-documentation targets.
Terrain-following corridor mapping with five KM66 carry-over targets and twelve structures within the active corridor.
Four-kilometer corridor plan with supplemental coverage and ten structure checkpoints.
High-side corridor planning with inspection imagery for five priority structures.
Corridor orthomosaic planning with inspection photography for six ATAT structures.
Interactive field map for the 260814 ODT documentation targets.
Mission reference for the KM 37+000–38+500 corridor.
Mission reference for the KM 44+000–45+200 corridor.
Mission 260812 corridor reference with terrain context and the PIV at KM 33+760.
Mission 260812 corridor reference with terrain context and the KM 20+880 viaduct.
Mission 260812 corridor reference with alignment elevations, satellite and terrain views.
Loading preview…
Loading preview…
Loading preview…
Reusable mission references
Structure and viaduct mission pages retained for repeat coverage and future planning.
Loading preview…
Loading preview…
Loading preview…
Loading preview…
Loading preview…
Loading preview…
Loading preview…
Loading preview…
Loading preview…
Pending confirmation
Mission pages awaiting scheduling or final field confirmation.
Operational resources
Weather, equipment, field checklists, operating procedures and regulatory references.
Historical mission references, dated coverage reports, and status baselines.
Loading preview…
Loading preview…

116 covered and 90 pending structures, with an interactive coverage map.
August corridor coverage, documented structures and the next mapping front.