☰
Home
Core Services
Specialized Projects
Home
Core Services
Specialized Projects
Industry Solutions
Documents
Home
Core Services
Specialized Projects
Industry Solutions
Documents
Hub
Weather
Flight Planning
Viaducts
ODTs
ODT Hub
AT-AT ODT documentation and field references
ODT 260814
KM 22+750, 22+920, 24+783, 28+187 and 28+466
Monthly Reports
September 2026 Report
Mapping activity, 50 structure visits and six corridor segments
August 2026 Report
Corridor coverage and 55 documented assets
Flight Missions
261021 · Weekly Flight Plan
Week of October 21 · 2026
261014–261016 · Weekly Flight Plan
October 14–16 · KM36+300–KM48+500 corridor missions and reviewed TOP options
261007–261009 · Weekly Flight Plan
October 7–9 · corridor missions and reviewed TOP alternatives
260930–261002 · Weekly Flight Plan
September 30–October 2 · KM20 S/N, connecting corridor and La Estadía
260923–260925 · Weekly Flight Plan
September 23–25 · viaduct photogrammetry and column documentation
260917–260918 · Weekly Flight Plan
September 17–18 · corridor and structure documentation
260910–260911 · Weekly Flight Plan
September 10–11 · KM 33–45 corridor and structure program
260902–260904 · Weekly Flight Plan
September 2–4 · KM 20–42 structure program
Viaducto S/N · KM 20
Viaduct mission planning
KM 20+000-20+900
Mission 260812 · corridor reference
KM 21+200-22+200
Mission 260812 · corridor reference
La Estadía · KM 22
Viaduct mission planning
Los Gallos · KM 27
Viaduct + tunnel mission blocks
S/N + Tlazala · KM 30-32
Paired viaduct mission planning
KM 25-27 · KM 28-30 · KM 32-33
Three terrain-following earthworks missions
KM 33+000-35+000
Mission 260812 · corridor reference
KM 37+000-38+500
Mission 260813 · 120 m AGL corridor
Cahuacán III · KM 39
Viaduct mission planning
KM 39+500-44+000
Two earthworks missions + optional ODT references
Viaducto S/N · KM 42
Viaduct mission planning
KM 44+000-45+200
Mission 260813 · protective coverage extension
KM 46-48
Ground control + field planning
KM 46-50
Three flight missions + eight ODT targets
KM 51-54
Two flight missions + six structures
KM 54-57
260730-1 + 260730-2 · seven structures
KM 56-59
260819 · corridor mapping + six structures
KM 63-65
260820 · corridor mapping + five structures
KM 65-67
260821 · corridor mapping + ten structures
KM 67-69+200
260826 · terrain-following corridor + seventeen structures
Los Chaparrales + El Pescado · KM 73-75+750
Two viaducts, intermediate corridor and Banco Margarito
El Salto + KM 92-97
Viaduct, three corridor missions and Banco Santo Domingo
KM 93+490-97+220
260826 · terrain-following corridor + eighteen structures
Banco Santo Domingo · KM 99+160
260827 · equipment, extraction areas and material stockpiles
Mission Execution
261014–261016 · October 14–16
Mission execution report · 2026
261007–261009 · October 7–9
Mission execution report · 2026
260930–261002 · September 30–October 2
Mission execution report · 2026
260923–260925 · September 23–25
Mission execution report · 2026
260917–260918 · September 17–18
Mission execution report · 2026
260910–260911 · September 10–11
Mission execution report · 2026
260902–260904 · September 2–4
Mission execution report · 2026
Survey Control
Control Points
Calibrations
Volumetrics
Operations & Safety
Equipment
Field Checklist
SOP
NOM-107