33Visual · Aerial Intelligence

KM56 – KM59

Corridor mapping for orthomosaic production, plus perspective and top-down photography of six structures identified by ATAT between KM56+365 and KM58+250.

260820 · August 20, 2026
KM56+000 – KM59+000 · Corridor and structure reference
PDF stationing is shown explicitly: AT KM58+573.961 / AD KM56+000.000. The repeated KM57 references are intentional and occur on opposite sides of this station equation.
Capture reference
Project trazo · corridor mapping and orthomosaic.
AT / AD station references from the project PDF.
ODT · inspection photography marker.
PSP&G / PSV · inspection photography marker.
Primary TOP · planned daily launch position.
Optional TOP · repositioning point if operationally required.

Capture scope

6Structures
3Mission Blocks

The corridor mission supports orthomosaic production using cenital imagery only. Each marked structure remains a separate general-inspection capture task for the construction progress report.

FlightHub program · cenital / nadir-only: 3,087.1 m corridor · 400,976.59 m² · 50:18 estimated duration · 3,127 photographs · 1,200 m cutting distance · 65 m left/right extensions · 75 m AGL · 2.02 cm/pixel · 80% / 80% overlap · 21 m/s global flight speed · flight direction vertical to centerline · elevation optimization and real-time terrain follow enabled · centerline included · Smart Oblique disabled.

Primary TOP · KM57+500–KM57+600: use the highway alignment within the right-of-way near PSV 50. The three mission blocks may be launched from this single location when field conditions support the complete operation.

Optional TOP · near KM56+400: reposition within the right-of-way for Block 3 only if VLOS, command link, traffic control, transfer, battery reserve or RTH conditions require it.

Field validation required: keep the aircraft, crew and vehicle within the authorized highway right-of-way; confirm a safe roadway work area, traffic control, GNSS/RTK visibility, command link, VLOS, obstacles, transfer altitude and the complete emergency RTH path. DJI FlightHub routes remain the execution source.

Structures

#StationStructureStructure imageryATAT note
01KM56+365PSP&G 53Perspective + top-down100%
02KM56+400ODTPerspective + top-down100%
03KM56+686ODTPerspective + top-down100%
04KM57+250ODTPerspective + top-down100%
05KM57+600PSV 50Perspective + top-down100%
06KM58+250ODTPerspective + top-down100%
Stationing note: the project PDF defines the station equation as AT KM58+573.961 / AD KM56+000.000; consequently, KM57 appears once before and once after the equation. The “100%” values reproduce ATAT’s source note and do not indicate completion of 33Visual capture work.