33Visual · Aerial Intelligence

KM65 – KM67

Continuous corridor mapping for orthomosaic production, an independent KM66+300 supplemental mission, and perspective and top-down photography of ten structures between KM65+137 and KM66+969.

260821 · August 21, 2026
KM65+000 – KM67+000 · Missions and structure capture
The project trazo and KM references are anchored to the supplied KML. Use the filters to review missions, the supplemental arm, or structure markers independently.
Map legendProgrammed coverage
KM65 – KM67 · corridor mapping and orthomosaic.
KM67 – KM67 · corridor mapping and orthomosaic.
KM66+300 · supplemental mapping arm.
ODT · inspection photography marker.
PIV · inspection photography marker.
Primary TOP · planned daily launch position.
Optional TOP · repositioning point if operationally required.
Select a marker · Ctrl / Command + scroll to zoom

Flight plan

The corridor remains one continuous programmed route using cenital imagery only. The 1,100 m cutting distance generates five independently manageable blocks for batteries, interruptions and field sequencing.

KM65 – KM67 corridorCenital · terrain follow

4,212.8 m corridor · 547,466.25 m² · 65 m left/right extensions · 75 m AGL · 2.02 cm/pixel GSD · 80% / 80% overlap · 21 m/s global flight speed · flight direction vertical to centerline · elevation optimization and real-time terrain follow enabled · timed-interval photography · Smart Oblique disabled · 1 h 05 min 16 s · 4,217 photographs.

KM66+300 supplemental armIndependent cenital mission

349.6 m · 11,237.92 m² · 75 m AGL · cenital / nadir-only capture · real-time terrain follow · 8 min 45 s · 169 photographs.

Primary TOP · KM65+700: use the highway alignment within the right-of-way on the higher western side. The five corridor blocks may be launched from this location when field conditions support the complete operation.

Optional TOPs · KM67+000 and KM68+200: reposition within the authorized highway right-of-way only if VLOS, command link, traffic control, battery transfer or RTH conditions require it.

Field validation required: confirm a safe roadway work area, traffic control, the complete ascent, transfer and emergency RTH profile, canopy, structures, command link and VLOS before execution.
5Corridor Blocks
4.2 kmLinear Coverage
1:14:01Programmed Time
4,386Estimated Photos
MissionCoverageModeOperational structureEstimate
KM65 – KM6765+000 – 67+00075 m AGL · NadirLinear · part of five generated blocksIncluded in corridor total
KM67 – KM6967+000 – 69+00075 m AGL · NadirLinear · part of five generated blocksIncluded in corridor total
KM66+300 ArmSupplemental 349.6 m75 m AGL · NadirIndependent linear mission08:45 · 169
Map footprints, primary and optional TOP positions, and generated block markers are planning references. Execute only the validated DJI FlightHub routes.

August 21 structure capture

The programmed corridor mapping supports orthomosaic production. Each listed structure separately requires perspective and top-down photographs for general inspection and the construction progress report.

#StationStructureStructure imageryATAT note
01KM65+137PIV · El AmarilloPerspective + top-downPending reference confirmation
02KM65+320ODTPerspective + top-down—
03KM65+350ODTPerspective + top-down—
04KM65+531ODTPerspective + top-downPending reference confirmation
05KM66+254PIV 57Perspective + top-down—
06KM66+457ODTPerspective + top-down—
07KM66+529ODTPerspective + top-down—
08KM66+641ODTPerspective + top-down—
09KM66+942ODTPerspective + top-down—
10KM66+969ODTPerspective + top-down—
Pending reference confirmations reproduce the current ATAT/PDF reconciliation status.