Mission plan
Map the surface identified by ATAT within the supplied property-limit corners as the final scheduled capture location on Friday, August 28.
Banco Santo DomingoFriday · final stop
Capture the equipment on site, material-extraction areas and material stockpiles throughout the supplied surface.
Friday itinerary: office ETA 08:45 · ETD 09:00 · first structure KM96+639 PSV 69 at 09:30 · ETC Banco Santo Domingo at 17:00 · RTB 17:30.
TOP · 19.840782, -99.914861: set up immediately beside the capture perimeter with the Emlid Reach RS2+, Starlink and drone RC together. Confirm open sky, local NTRIP, command link, VLOS and the complete ascent and RTH profile.
Access: the separate arrival reference remains east of the capture surface. Confirm the route from the access point to the TOP and verify property authorization before setup.
TOP · 19.840782, -99.914861: set up immediately beside the capture perimeter with the Emlid Reach RS2+, Starlink and drone RC together. Confirm open sky, local NTRIP, command link, VLOS and the complete ascent and RTH profile.
Access: the separate arrival reference remains east of the capture surface. Confirm the route from the access point to the TOP and verify property authorization before setup.
KM99+160Client reference
19.840782
-99.914861TOP
-99.914861TOP
| Item | Status |
|---|---|
| Access reference | 19.840209, -99.910963 |
| Capture surface | Four corners received |
| Capture scope | Equipment · extraction · stockpiles |
| Takeoff point | Beside perimeter |
| Capture date | August 28, 2026 |
Capture and field confirmation
- Capture all equipment present within the supplied surface.
- Document material-extraction areas within the property limits.
- Include all visible material stockpiles in the aerial coverage.
- Validate the supplied TOP for open sky and visibility across the complete perimeter.
- Keep the RS2+, Starlink and RC together and verify local NTRIP before launch.
- Check active machinery, personnel, vehicles and other operational obstacles.
- Confirm the four-corner boundary against visible property limits in the field.
- Verify altitude, overlap, ascent, transfer and RTH settings in FlightHub.
