Verify existing control
Independently check selected control points and elevation benchmarks against project records.

A common positioning reference for construction, ground surveying and Aerial Intelligence
AT-AT requires consistent positioning across its highway corridor so that construction plans, ground surveys and aerial mapping align.
We propose a shared project survey control network supported by permanent GNSS reference stations. Participating teams would access corrections through an interoperable service, with documented coordinates, retained observations and independent verification.
A proof of concept will verify the relationship to existing construction control, equipment compatibility, positioning accuracy and service continuity before full deployment.
Project alignment and chainage from trazo.kml · office locations supplied by the project team.
Teams currently work with different local coordinate systems along the corridor. The challenge is to connect those systems to a common, documented reference while preserving the relationship to approved construction plans.
The solution must combine verified ground control and elevation benchmarks with the GNSS correction service. Highway-survey guidance establishes project control as the basis for subsequent surveys and requires GNSS localization to connect to adjusted control.
Engineering precedent: Caltrans Control Surveys, §9.4-3 · Caltrans Construction Manual, §3-5. These references do not establish AT-AT contractual requirements.
The PoC will demonstrate that the proposed solution provides consistent, repeatable positioning for ground survey teams and the Aerial Intelligence team.
Independently check selected control points and elevation benchmarks against project records.
Document the agreed horizontal and vertical references, projection, units and grid-to-ground treatment. Verify their relationship to existing construction systems and Mexico’s official geodetic framework.
Test selected installations, including mounting, communications, power and observation recording.
Compare repeated measurements from different equipment against independent checkpoints excluded from calibration. Test representative corridor conditions, station transitions and the longest baselines. Compare single-station and network RTK/VRS services where available.
Verify outage recovery, alerts and retained RINEX observations suitable for independent processing.
Independently review results against accuracy, repeatability, availability, recovery and interoperability criteria agreed with the client before testing.
The reference specification will document the connection to INEGI’s geodetic framework. NTRIP supports open distribution of corrections; compatibility with the equipment used on AT-AT will be demonstrated during testing. Elevation checks will use leveling or total stations where construction tolerances require them.
INEGI RGNA · BKG NTRIP documentation · phased testing and repeated checks: NGS advisory draft guidelines.
Each station needs verified coordinates before it becomes an operational reference. We propose static processing with Natural Resources Canada’s CSRS-PPP, followed by independent checks and a documented connection to project control.
CSRS-PPP works worldwide, including Mexico. It is distinct from NOAA’s OPUS, which uses differential processing against reference stations. A PPP solution provides a geodetic position; it does not establish AT-AT’s construction elevations or validate existing local systems by itself.
Assign a station identifier. Record receiver and antenna models, serial numbers, firmware, antenna reference point, orientation and measured offsets to the monument. Confirm the antenna calibration model before processing.
Proposed commissioning target: two complete 24-hour sessions on separate days, with the installed antenna unmoved. Retain one-second raw observations where supported, observation and navigation files, and a log of gaps or interruptions. Duration is a project proposal, not a CSRS-PPP requirement or an accuracy guarantee.
Check RINEX headers, supported signals and antenna offsets. Submit each session in static mode using the ITRF output option. Save the full reports and inspect convergence, uncertainties and warnings. Use Rapid or Final satellite products for the review and record which products and reference realization were used.
Compare repeat sessions in the same reference frame and epoch. Independently process simultaneous baselines using suitable INEGI RGNA or IGS stations and test checkpoints excluded from calibration. Resolve discrepancies before accepting the coordinates; agreement between two bases alone does not establish accuracy.
Document the agreed WGS84 realization and coordinate epoch, with the processing reference and any required transformations. INEGI publishes RGNA coordinates in ITRF2008, epoch 2010.0; these cannot be compared directly with current-epoch PPP results. Verify construction elevations against AT-AT’s benchmarks. UALI will assess processing and local-system integration.
The appointed geodetic specialist prepares the station coordinate report for independent review and AT-AT approval. Configure the approved coordinates using the receiver’s specified reference point. Retain original RINEX files, processing reports, field records and configuration exports. Subsequent coordinate changes require a documented review and a new version.
Before recording: document the antenna and radome code, calibration information, antenna-height convention, raw logging interval and export procedure. Keep the configuration unchanged during both sessions.
For each submission: select Static and ITRF; retain the original file and separately document any corrected header. Preserve station ID, UTC start and end, interval, antenna offsets, processing date, product type, output frame and epoch, uncertainty estimates and all warnings.
The reviewer will confirm whether each output coordinate refers to the monument, antenna reference point or phase centre before programming the receiver. A Canadian geoid or height datum will not be used for construction elevations in Mexico.
Acceptance: agree horizontal and vertical accuracy, repeatability and service criteria before testing. The 15 mm horizontal and 25 mm vertical differences in the draft protocol are proposed consistency limits, not approved AT-AT requirements. Field comparisons must also include independently verified control.
Water vapour introduces tropospheric delay. Multi-frequency tracking does not remove this delay by itself. Network corrections can reduce spatially correlated atmospheric errors, but cannot guarantee their complete removal or continuous RTK Fixed operation.
The correction service will use the operating mode suited to the station layout and demonstrated by the proof of concept. The virtual baseline length is not a measure of the remaining positioning error.
During the pilot, compare repeated checkpoint measurements across different times and representative elevation differences. Record correction age, time to fix, Fixed/Float status, signal quality and cycle slips where available, weather conditions and space-weather alerts. Test physical-base and VRS corrections where supported.
Severe ionospheric scintillation can cause loss of signal lock. For control observations, flag interruptions and recheck independent control after recovery. Inspect mounts after significant wind or suspected displacement. Repeat affected observations if they do not meet the agreed criteria; retain raw data for review and supported PPK workflows.
Each station’s antenna model, calibration identifier and physical reference point will be documented and used consistently in RINEX records, processing and receiver configuration.
The proposed mapping grid is WGS84 / UTM Zone 14N, with eastings and northings in metres. The reference realization, coordinate epoch and elevation reference will be recorded separately. UTM grid distances and construction ground distances require a documented scale treatment.
Local construction control: AT-AT’s topography team will identify the control points, benchmarks and local grids used in each work area. Any transformation or site calibration will be assessed within its area of validity, using distributed control and independent checkpoints excluded from the fit. UALI will assess integration into its processing workflow; the agreed independent review will document compatibility with existing records.
PPK continuity: 33Visual will retain original images, aircraft GNSS observations, camera-event timing and base observations covering the acquisition period. UALI will assess a compatible PPK processing workflow and verify the outputs against independent checkpoints. Base recordings alone are insufficient for PPK, and post-processing cannot reconstruct missing satellite observations.
Power, connectivity and access: Internet access will combine cellular service, Starlink and enterprise ISP connections as appropriate for each site. Power and battery backup will cover the receiver and communications equipment together. Commissioning will test interruptions, recovery and local recording. Individual user accounts and narrowly defined network permissions will support controlled access.
Correction-service configuration: Register the stations, define the service area and configure documented mountpoints and individual user accounts. For VRS operation, use the approved network geometry and configure rover-position messages where the service requires them. Verify representative corridor locations, service boundaries and station outages during acceptance testing.
IT commissioning: For the hosted architecture, document the caster and management endpoints, required ports and connection direction. Permit the necessary outbound connections and return traffic. Authorize inbound access only for explicitly deployed services. Test corrections, monitoring, remote management and reconnection under the project’s security controls.
The preferred station spacing keeps the mapped alignment within 15 km of a reference station. The proof of concept will verify positioning accuracy and service continuity across the corridor.
The saved candidates are along the highway right of way, at the Jilotzingo and Atlacomulco office roofs, and at Banco Santo Domingo. Layout options compare station spacing and backup arrangements.
Select at least two stations to compare a layout.
Choose antennas to compare route coverage and distances.
Lower is closer. Dashed line: 15 km design limit. Hover over the line for chainage and distance.
Project chainage runs east to west. Elevations shown here are approximate Mapbox terrain values.
Station letters match the map. Amber: selected stations; grey: alternative options. Chainages are approximate and normalized by alignment version (620 = KM20). Office and Banco markers show approximate chainage references for off-corridor sites.
Select a layout or choose individual antennas. The shaded circles show the 15 km design range around each active station. Both graphs follow project chainage from east to west. The distance graph measures the straight-line distance to the closest active antenna.
Satellite previews use the same antenna coordinates as the map. Survey images are labelled separately. The terrain profile uses regional Mapbox elevations; survey DTMs support local site review.
| Antenna offline | Longest distance to the remaining antennas |
|---|
Mapbox elevation limitations · Candidate KML · Candidate GeoJSON