33VISUAL · AERIAL INTELLIGENCE

Nov 4–6 · Mojonera recovery
& field measurements

Locate, identify and mark the mojoneras used by the topography brigadas from KM20–KM42. Measure each point twice to check repeatability and develop a traceable reference for 33Visual.

261104 · 261105 · 261106 · NOVEMBER 4–6, 2026
HOW THE TWO MEASUREMENTS WORK

A and B measure the same physical point.

A

First measurement

Identify the mark, center and level the setup, then collect three minutes with FIX. Save a separate record, such as 3265-A, with its time, pole height and receiver orientation.

B

Repeat measurement

Return to the exact same center. Obtain a fresh initialization, rotate the whole pole and receiver 180°, recenter and relevel, and collect another three minutes with FIX. Save 3265-B.

Compare A and B before accepting a mean. Agreement checks repeatability; coordinate accuracy still needs independent reference checks. The schedule below assigns a first visit and a repeat visit to each section.

261104 · NOV 4A · KM20–KM34Morning: KM20–KM27 · Afternoon: KM27–KM34
261105 · NOV 5B · KM27–KM34
A · KM34–KM42
Morning B: KM27–KM34 · Afternoon A: KM34–KM42
261106 · NOV 6Finish BMorning: KM34–KM42 · Afternoon: KM20–KM27

Proposed measurement logistics for the 9:30–15:30 working day. A = first occupation; B = repeat. Coordinate access and realistic capacity with each brigada before setting out. The purpose this week is to locate, identify and mark the mojoneras used in the field, with traceable measurements for 33Visual.

2.000 mVerified pole height
3 minEach occupation · FIX only
AM ↔ PMDifferent-day observation windows
180°Whole pole + receiver reversal

Purpose of this visit: recover marks and screen measurement repeatability. Coordinate accuracy and acceptance for a GCP, checkpoint or flight base require independent reference checks.

PARA LEER EN CAMPO · EQUIPO DE TOPOGRAFÍA

Recorrido y recuperación de mojoneras

Esta semana queremos recorrer con ustedes las mojoneras que están utilizando las brigadas de topografía y establecer un registro de referencia para el trabajo de 33Visual. Iniciaremos en el KM20 y coordinaremos el orden y el alcance de cada jornada con los frentes activos de cada brigada.

Traemos los puntos de las calibraciones que recibimos, pero también queremos localizar otras mojoneras que ustedes conozcan, aunque no aparezcan en nuestra lista. Nos ayudaría que nos indiquen el identificador, el centro exacto que se debe medir, su origen y si el punto ha sido movido, repuesto o afectado por la obra. Con su apoyo acordaremos un marcado visible que permita reconocer cada punto, sin cubrir su centro ni alterar la marca existente.

En cada punto vamos a fotografiar la marca y el entorno, registrar su estado y medir durante tres minutos con solución FIX. Después regresaremos, en otra jornada según el programa de tramos, procurando cambiar por lo menos tres horas el horario de observación para tener mayor diversidad geométrica, reiniciaremos el receptor y repetiremos la medición con el conjunto de bastón y receptor girado 180 grados, nuevamente centrado y nivelado.

Si las mediciones no coinciden dentro de nuestros límites de revisión, investigaremos la causa y programaremos otra observación independiente. Si encontramos una marca sin identificación, le asignaremos una clave provisional sin modificar su inscripción ni reemplazar su nombre original.

Les pedimos cualquier ficha, croquis, fotografía, coordenada o antecedente disponible, incluyendo sistema de coordenadas, datum, época, referencia de alturas y método de levantamiento. Mantendremos separadas las coordenadas originales y nuestras observaciones hasta entender su relación.

Esta visita nos permitirá identificar los puntos y evaluar qué tan repetibles son nuestras mediciones. La coincidencia entre visitas no demuestra por sí sola la exactitud de las coordenadas. Antes de usar un punto como referencia aceptada, completaremos su comprobación independiente.

Equipo de topografía

Guiar el recorrido, identificar el centro y los antecedentes de cada marca, señalar puntos adicionales y facilitar fichas o registros disponibles.

33Visual

Registrar identidad y estado, ejecutar las observaciones A/B, conservar evidencias y revisar coordenadas y referencias antes de aceptar un uso.

WORKING DAY · 9:30–15:30 · A = FIRST / B = REPEAT

Three sections. Two measurements each.

Recover and measure the first two sections on Day 1. On Day 2, repeat one of those sections and measure the third. Finish the remaining repeats on Day 3.

Day9:30–11:45 · morning13:00–15:15 · afternoon
261104 · Nov 4A · KM20–KM27Locate, identify, mark and measureA · KM27–KM34Locate, identify, mark and measure
261105 · Nov 5B · KM27–KM34Repeat Day 1’s afternoon sectionA · KM34–KM42Locate, identify, mark and measure
261106 · Nov 6B · KM34–KM42Repeat Day 2’s afternoon sectionB · KM20–KM27Repeat Day 1’s morning section

11:45–13:00: transfer, break and preparation. 15:15–15:30: review and backup. These are planning allowances, not guaranteed capacities; confirm the number of marks and access with the topography team.

Either direction works

You may measure B while returning along the chainage. Example: A from KM27→KM34 on Day 1; B from KM34→KM27 on Day 2. Follow the exact point IDs and record each occupation’s actual time; route direction does not establish measurement independence.

Plan the connecting drive

One useful Day 3 order is B from KM42→KM34, then transfer to KM27 and measure B toward KM20. This reduces the midday transfer to the KM34–KM27 connection. Confirm the actual access route and travel time locally.

Check each point’s clock: the schedule alternates morning and afternoon windows. Aim for a clock-time change of at least three hours for stronger geometry diversity. Reversing the route can bring some repeat times closer to the first visit; flag those pairs for an additional check. A same-time return about 24 or 48 hours later may reproduce similar GPS geometry.

Keep the supplied IDs and use one record per physical mark, including shared boundary points at KM27 and KM34. Additional marks found in the field need their own A/B plan. If recovery exceeds a time slot, record the unfinished point or repeat explicitly and coordinate a follow-up; completing the route is not evidence that every point has two observations.

REFERENCE INVENTORY · STARTING AT KM20

Control points & drawing chainage

121 source vertices · 54 ICA circles · 67 HYCSA squares · physical recovery pending

Drag to pan · pinch or + / − to zoom
ICA referenceHYCSA referenceDrawing referenceDrawing station anchor

Navigation reference: source UTM plotted assuming WGS84 / UTM 14N; realization and epoch remain unconfirmed. White line: source comparison reference 110384; cyan lines: alternate CAD candidates. Drawing labels retain their original station family; they are not survey monuments or an independently verified centerline. Section zooms fit the drawing anchors across source versions; visible labels use the selected family. Confirm the active chainage revision with the topography team. Changing station family does not move a control point. Internet is required for Mapbox imagery.

Near drawing anchor KM20+120.00

3269 MD20-6-3

ICA · CAL1 · physical recovery pending

Anchor offset ≈ 129 m. This is a nearby drawing label, not a measured chainage for the mark.

Near drawing anchor KM20+760.00

3265 MI20-8-2

ICA · CAL1 · physical recovery pending

Anchor offset ≈ 47 m. This is a nearby drawing label, not a measured chainage for the mark.

Near drawing anchor KM21+580.00

3263 MI21-10-1

ICA · CAL1 · physical recovery pending

Anchor offset ≈ 52 m. This is a nearby drawing label, not a measured chainage for the mark.

These are starting-area search candidates, not confirmed stops or the full recovery inventory. Extend the circuit with the topography team and record additional marks separately. Supplied ICA coordinates contain no heights. HYCSA source heights have an unconfirmed vertical reference; zero values are unavailable. [9]

FIELD PROCEDURE · READ THE MAIN ACTION FIRST

One mark. Two separate occupations.

First visit: identify → mark → set up → initialize → measure A. Repeat visit: verify timing → initialize → reverse the pole and receiver 180° → recenter and relevel → measure B. Either route direction is acceptable.

01
Before the circuit

Brief the topography team

Read the Spanish briefing together. Ask about additional marks, replacements, disturbance, access and survey records. Confirm who can identify the exact survey center.

Use the three-day section schedule. Agree travel direction and access with the brigadas; log any extra mark or unfinished repeat as a specific follow-up.

02
Before the circuit

Check the setup and reference

Inspect the pole tip, calibrated bubble, receiver attachment and tripod support. Confirm project units, coordinate system and height reference. Record the correction provider, mountpoint and, where available, base ID, baseline length, frame and epoch.

Use independently referenced corrections. Keep the supplied mojoneras out of any localization used to test those same coordinates.

03
Before the circuit

Set Flow for a three-minute occupation

Connect to the RS2+ → Survey → open the project → + → Pole icon: enter the verified height to the receiver bottom, normally 2.000 m. Collector gear → FIX only → averaging: 180 seconds. Record app and receiver firmware versions.

Include adapters in the measured height. Flow adds the antenna offset automatically; do not add 0.134 m to the pole entry. The RS2+ requires a plumb pole; it has no IMU tilt compensation. [1, 2]

04
Before the circuit

Check independently reliable control

If available, observe a control point with independently supported coordinates in the same reference system. Compare against its coordinate uncertainty and the intended survey accuracy. Record the result and repeat this check at the end.

If no reliable reference is available, continue recovery and screening, with absolute accuracy provisional. Repeating an uncertain mojonera does not turn it into known control.

05
Circuit A · each point

Recover, identify and mark the exact point

Use the reference map and local knowledge. Preserve the supplied ID and inscription. Assign ATAT-NEW-001, ATAT-NEW-002, etc. only to newly found unidentified marks; cross-reference any local name. Agree visible identification with the topography team, keeping the survey center and existing inscription clear. Photograph the center, marking, surroundings and setup; record condition, access and identifying witness.

A nail, bolt or nearby replacement is a separate point until its relationship is established. Record any offset label or target and its relationship to the center. Log an unidentified or damaged mark without accepting it.

06
Circuit A · each point

Center, level and obtain a fresh FIX

Seat the tip on the exact center, level and brace the pole. Record the receiver orientation using a repeatable physical feature. For a separate initialization, finish any raw log and restart the rover receiver; reconnect and wait for active corrections and a newly established, stable FIX. Recheck the project, height and logging.

Restart the receiver, not just the phone app. Closing Flow or reconnecting Bluetooth is not evidence of a new initialization. Detailed restart steps are below. [3]

07
Circuit A · each point

Measure A and record its start time

Collect one uninterrupted 180-second occupation, keeping the pole stationary. Save 3265-A, for example, with MI20-8-2 in the description. Record start/end times with time zone, pole height, H/V estimates, available DOP, satellite count, correction age, correction source and raw-log name.

Cancel and restart after movement, loss of FIX or an unsuitable correction/quality condition. FIX and displayed precision are quality indicators, not proof of absolute accuracy.

08
Between visits

Follow the section schedule; check each point’s times

Repeat recovery and occupation A at other accessible marks, including those identified by the topography team. Use November 4 for A in KM20–KM27 and KM27–KM34. On November 5, repeat KM27–KM34 in the morning and collect A in KM34–KM42 in the afternoon. On November 6, repeat KM34–KM42 in the morning and KM20–KM27 in the afternoon. Either travel direction is acceptable; record actual times at each mark.

Aim for at least a three-hour change in time of day across different-day occupations. A reversed route can put some repeats near the original clock time: record limited geometry diversity and plan an additional check. For a same-day fallback, allow at least three hours between starts; four hours preferred. [4, 5]

09
Circuit B · each point

Reinitialize, reverse and rebuild the setup

Finish the raw log and restart the rover receiver for a separate initialization. Rotate the whole pole and receiver 180° from A, recenter the tip, relevel and brace the setup. Verify the actual height. Reconnect, confirm corrections and stable FIX, then confirm raw logging is running.

Keep the receiver fully attached. Reverse its azimuth; keep the pole upright. Reversal addresses plumbing bias, while time separation and reinitialization provide additional checks. [3, 4, 6]

10
Circuit B · each point

Measure B as a separate occupation

Collect a second uninterrupted 180-second occupation. Save 3265-B, for example, with its own time, orientation, quality indicators, correction source and log reference. Preserve the A record.

Use the same physical center and consistent coordinate/height conventions. Record any change of mountpoint, base or reference settings.

11
Before accepting a mean

Compare; investigate disagreement

In a common reference system compute ΔE, ΔN, horizontal separation √(ΔE² + ΔN²), and the absolute height difference. Use 0.020 m horizontal and 0.030 m vertical as provisional internal review limits. Check identity, setup, corrections, environment, actual separation and time-of-day diversity before any mean is accepted.

If either limit is exceeded, retain all observations, investigate and schedule a third independent visit. Document exclusions; do not select whichever two shots agree. Passing the limits establishes a repeatability screen only.

12
Close and review

Back up; assign a status and intended role

Recheck independently reliable control when available. Back up the untouched Emlid export, raw GNSS logs, photos and field register. After resolving issues, save an explicitly provisional A/B mean separately in one common metric reference system, while retaining the original occupations and source coordinates.

Use: identity unconfirmed / recovered / repeatability passed / reobserve / independently checked. Keep photogrammetric checkpoints out of model adjustment. Acceptance as a GCP, checkpoint or base requires a separate accuracy and reference review.

Return timing · same day or next day?

Same day: minimum three hours between occupation start times; four hours preferred. Example: A 08:00 → earliest B 11:00, preferred B 12:00.

Different day: remove and rebuild the setup, obtain a fresh initialization, and aim for a change in observation clock time of at least three hours for stronger geometry diversity. Example: Wednesday 08:00 → Thursday 11:00 (27 hours); Wednesday 11:00 → Thursday 08:00 (21 hours).

Exactly 24 hours: still a useful repeat, but it may reproduce similar GPS geometry and multipath. Record the limited geometry diversity and obtain an additional observation with a changed time window before relying on the pair as independent control evidence. Other GNSS constellations have different repeat periods. [5]

Plan the revisit explicitly. The main schedule completes A on November 4–5 and B on November 5–6. An additional mark first measured on November 6 needs its own later repeat. Timing supports independence; it does not demonstrate coordinate accuracy by itself.

Fresh initialization · exact operator sequence
  1. Save the current point and finish the active raw log normally.
  2. With the receiver connected in Emlid Flow, tap its name and use the receiver restart control. If unavailable in your installed interface, turn the RS2+ off normally and back on using its power button.
  3. Reconnect to the receiver. Confirm the correction stream is active and that the receiver has established FIX after the restart; allow the solution and quality indicators to stabilize before collection.
  4. Reopen the survey project and verify pole height, FIX-only and 180-second averaging. Confirm that raw logging is running again, with a new log/session reference.
  5. Record the restart and new initialization in the occupation notes. Proceed only after centering, leveling and reference settings have been checked.

Verified documentation: Emlid describes the restart operation [3]. No dedicated “reset ambiguities” button was located in the documentation reviewed. This restart sequence is a conservative 33Visual field method; the installed app may label its receiver menu differently.

REPEATABILITY · REFERENCE ACCURACY · PRODUCT ACCURACY

Three separate checks

1 · FIELD SCREEN

≤ 2 cm H
≤ 3 cm V

Maximum A/B separation used as an internal investigation trigger. It is not a formal accuracy class or a statistical estimate of coordinate uncertainty.

2 · SURVEY COORDINATE GOAL

2 cm H / V

Proposed RMSE accuracy budget for independently checked control coordinates. Repeat agreement and Flow’s reported H/V estimates cannot demonstrate this on their own.

3 · PHOTOGRAMMETRY GOAL

5 cm H / V

Proposed product RMSE target for monitoring on well-defined points and suitable bare surfaces, tested with independent checkpoints. Confirm by pilot validation; this is not a construction acceptance specification. [7, 8]

H = horizontal magnitude; V = height in a consistent named reference. For A/B screening use horizontal separation √(ΔE² + ΔN²) and absolute height difference. RMSE targets describe independently evaluated errors, not a maximum error for every point. The numerical field limits are 33Visual’s provisional choices and must be reviewed against conditions and the required deliverable.

Both limits met

Check identity, setup and actual timing as well as the numerical differences. Record “repeatability passed; absolute accuracy provisional,” with a separate note on time-of-day diversity. A same-day interval under three hours or a different-day pair with a similar clock-time window requires an additional suitably timed check. Save a separate provisional mean only after issues are resolved.

Either limit exceeded

Hold the mean. Investigate the cause and arrange a third independently initialized, suitably separated occupation. Preserve all shots and explain any exclusion.

Geodetic review · why this procedure is appropriate, and its limits

The core practices are supported: stable centering and leveling, verified antenna height, FIX-only averaging, redundant independent setups, pole reversal, separated visits, field records and independent reference checks. [1–6]

Two × three minutes is a recovery and screening procedure. The 2011 NGS single-base guide includes three-minute observations in a higher-precision example, together with other conditions. Following only its duration and spacing does not establish that accuracy class. [4]

Formal control establishment needs a designed validation campaign. For comparison, NGS 92 Table 4 uses at least three five-minute occupations for local/secondary network RTK, while local single-base RTK uses four five-minute occupations, including one on a different day. These are parts of an OPUS Projects specification with other requirements; they are not Mexican project requirements or a certification of this circuit. [5]

Before accepting an anchor: confirm its stability and exact center, independently establish geodetic coordinates and uncertainty, reconcile realization/epoch and the vertical reference, and document the intended role. Use the longer static/PPP and independent-repeat workflow on the calibration page where appropriate. Do not treat a three-minute log as a substitute for that campaign. [9]

Maintain coordinate provenance: retain observed geodetic positions, source UTM and source planas separately. Resolve their relationship before comparison. A consistent offset can come from reference systems or epochs; it does not by itself show that a mark moved. Keep ellipsoidal heights separate from project elevations.

For drone products: a control point must have a visible, unambiguous image center, or a separately surveyed nearby target. Keep checkpoints out of localization/calibration and photogrammetric adjustment used for the product being tested; check their survey reference independently of the flight-base solution. Fine grading, structural positioning and construction acceptance require their own agreed specifications.

Pole reversal here applies to the short RTK occupations. For a later long static/PPP session, use its documented antenna orientation and height convention, and keep the receiver stationary throughout each log.

ONE RECORD PER PHYSICAL POINT

Copyable field record

AT-AT · FIELD CONTROL RECOVERY · 261104–261106
Point ID / source ID:
Local team identification / witness:
Mark center / condition / photos / access:
Coordinate system / realization / epoch / height reference:
Receiver / serial / firmware / Emlid Flow version:
Pole height to receiver bottom / adapter:
Correction provider / mountpoint / base ID / baseline:
Independent control check / reference record:

Occupation A — separate receiver initialization confirmed:
Start / end / time zone:
Orientation / FIX / H,V estimates / DOP / satellites / correction age:
Raw log / E / N / ellipsoidal h (or named height reference):
Same-day earliest B start = A start + 3 hours:
Preferred B start = A start + 4 hours:
Different-day B: aim for ≥3 hours change in clock time:
Actual interval / clock-time shift / diverse or limited window:

Occupation B — separate receiver initialization confirmed:
Start / end / actual separation:
180° reversal / recentered / releveled / height checked:
FIX / H,V estimates / DOP / satellites / correction age:
Raw log / E / N / same height reference:

ΔE / ΔN / horizontal separation / absolute height difference:
Internal screen: H ≤0.020 m and V ≤0.030 m:
Identity / setup / reference issues / third occupation:
Status / reviewer / date / intended role:
Absolute coordinate accuracy independently checked: yes / no
****

Preserve original Emlid exports. Store derived comparison results and accepted means separately. Add a photograph and setup/log reference for each occupation.

Best-practice references
PRIMARY SOURCES

Manufacturer instructions establish the receiver steps. Geodetic guidance supports the checks and explains the additional work needed for accepted control.

  1. [1] Emlid Flow · Collect points

    Verified controls for pole height, FIX-only collection and averaging. Three minutes is the 33Visual operating choice, not an Emlid requirement.

  2. [2] Emlid RS2/RS2+ · Antenna height for RTK

    Enter mark-to-receiver-bottom height. Flow applies the receiver offset. Height synchronization across app sections depends on firmware; recheck the actual values.

  3. [3] Emlid RS2/RS2+ · Receiver restart

    The guide documents restarting through Flow or the receiver power button. Using a restart between occupations is our conservative procedure for a separate initialization, not an Emlid-prescribed survey interval.

  4. [4] NOAA NGS · Single Base Real-Time GNSS Guidelines, v2.1 (2011)

    Equipment section and Appendix C support pole/bubble checks and 180° pole reversal. The higher-precision example uses three-minute observations and four-hour separation with additional baseline, geometry and control requirements.

  5. [5] NOAA NGS 92 · GNSS geodetic control surveys (2024)

    Table 4 and §4.1 distinguish formal network-RTK and single-base requirements, using five-minute occupations and separated repeat visits. The full OPUS Projects specification goes beyond this recovery circuit and applies to its stated US reference systems.

  6. [6] Emlid · Common GNSS surveying mistakes

    Supports bubble calibration and paired observations with 180° pole reversal to address plumbing bias. The RS2+ must be centered and leveled; newer receiver tilt features do not apply to it.

  7. [7] ASPRS · Positional accuracy standards

    Product testing and independent checkpoint accuracy are separate from repeat-shot differences. See the supporting ASPRS explanation below for the two-times-better control/checkpoint accuracy principle.

  8. [8] ASPRS · Edition 2 accuracy guidance (2023)

    Explains control/checkpoints at least twice as accurate as the product being tested and the contribution of checkpoint survey uncertainty to reported product accuracy.

  9. [9] 33Visual · AT-AT calibration inventory

    Project source for the 121 ICA/HYCSA vertices, source UTM and planas, drawing geometry, station-label families and longer static/PPP anchor workflow.