☰
Home
Core Services
Specialized Projects
Home
Core Services
Specialized Projects
Industry Solutions
Documents
Home
Core Services
Specialized Projects
Industry Solutions
Documents
Hub
Weather
Restrictions
Flight Planning
Structures
Viaducts
AT-AT viaduct documentation and field references
ODT Hub
AT-AT ODT documentation and field references
ODT 260814
KM 22+750, 22+920, 24+783, 28+187 and 28+466
Monthly Reports
October 2026 Report
39.0 km across 14 corridor missions and two viaduct visits
September 2026 Report
Mapping activity, 50 structure visits and six corridor segments
August 2026 Report
Corridor coverage and 55 documented assets
Weekly Missions
261118–261120 · Mojonera PPP Survey
November 18–20 · static GNSS survey plan and CSRS-PPP workflow
261111–261113 · Mojonera Recovery
November 11–13 · KM50–KM80 · project-control recovery with local topography brigades
261104–261106 · Mojonera Recovery
KM20–KM42 · repeat GNSS measurements
261028–261030 · Weekly Flight Plan
October 28–30 · KM58+500–KM70+500 corridor missions
261021 · Weekly Flight Plan
Week of October 21 · 2026
261014–261016 · Weekly Flight Plan
October 14–16 · KM36+300–KM48+500 corridor missions and reviewed TOP options
261007–261009 · Weekly Flight Plan
October 7–9 · corridor missions and reviewed TOP alternatives
260930–261002 · Weekly Flight Plan
September 30–October 2 · KM20 S/N, connecting corridor and La Estadía
260923–260925 · Weekly Flight Plan
September 23–25 · viaduct photogrammetry and column documentation
260917–260918 · Weekly Flight Plan
September 17–18 · corridor and structure documentation
260910–260911 · Weekly Flight Plan
September 10–11 · KM 33–45 corridor and structure program
260902–260904 · Weekly Flight Plan
September 2–4 · KM 20–42 structure program
Viaducto S/N · KM 20
Viaduct mission planning
KM 20+000-20+900
Mission 260812 · corridor reference
KM 21+200-22+200
Mission 260812 · corridor reference
La Estadía · KM 22
Viaduct mission planning
Los Gallos · KM 27
Viaduct + tunnel mission blocks
S/N + Tlazala · KM 30-32
Paired viaduct mission planning
KM 25-27 · KM 28-30 · KM 32-33
Three terrain-following earthworks missions
KM 33+000-35+000
Mission 260812 · corridor reference
KM 37+000-38+500
Mission 260813 · 120 m AGL corridor
Cahuacán III · KM 39
Viaduct mission planning
KM 39+500-44+000
Two earthworks missions + optional ODT references
Viaducto S/N · KM 42
Viaduct mission planning
KM 44+000-45+200
Mission 260813 · protective coverage extension
KM 46-48
Ground control + field planning
KM 46-50
Three flight missions + eight ODT targets
KM 51-54
Two flight missions + six structures
KM 54-57
260730-1 + 260730-2 · seven structures
KM 56-59
260819 · corridor mapping + six structures
KM 63-65
260820 · corridor mapping + five structures
KM 65-67
260821 · corridor mapping + ten structures
KM 67-69+200
260826 · terrain-following corridor + seventeen structures
Los Chaparrales + El Pescado · KM 73-75+750
Two viaducts, intermediate corridor and Banco Margarito
El Salto + KM 92-97
Viaduct, three corridor missions and Banco Santo Domingo
KM 93+490-97+220
260826 · terrain-following corridor + eighteen structures
Banco Santo Domingo · KM 99+160
260827 · equipment, extraction areas and material stockpiles
Mission Execution
261118–261120 · Mojonera PPP Survey
November 18–20 · three four-hour GNSS occupations and the CSRS-PPP protocol
261111–261113 · Mojonera Survey
Mission execution report · 2026
261104–261106 · Mojonera Recovery
Mission execution report · 2026
261028–261030 · October 28–30
Mission execution report · 2026
261021–261023 · October 21–23
Mission execution report · 2026
261014–261016 · October 14–16
Mission execution report · 2026
261007–261009 · October 7–9
Mission execution report · 2026
260930–261002 · September 30–October 2
Mission execution report · 2026
260923–260925 · September 23–25
Mission execution report · 2026
260917–260918 · September 17–18
Mission execution report · 2026
260910–260911 · September 10–11
Mission execution report · 2026
260902–260904 · September 2–4
Mission execution report · 2026
Survey Control
Control Points
Calibrations
Volumetrics
Operations & Safety
Equipment
Field Checklist
SOP
NOM-107